quantity of sand in pcc

cement consumption in PCC 1:5:10 and M5 - Civil Sir

41.6 bags (2079 kg) cement consumption in pcc 1:5:10 for 100m2 & 150 mm thick concrete slab. sand quantity consumption in PCC 1:5:10. Part of sand in mix = 5/16. 1m3 = 35.32 cuft. Dry volume =23.1 m3. Volume of sand = (5/16)×23.1 × 35.32 cuft. Volume of sand = 255 cuft. if one tractor trolly has = approx =80 cuft. Than no. of tractor trolly

Learn More

Plain Cement Concrete ( PCC) | Preparation Of Plain Cement

a. When PCC work is to be carried out underground; loose materials from the side of the pits or trenches should be removed. b. De-watering should be done before PCC work when the water table is high. c. Water should be added to the concrete according to the water-cement ratio. d. Shuttering used in the PCC work should have the same size and

Learn More

PLAIN CEMENT CONCRETE WORK PROCEDURE - MATERIAL, PCC

4/14/2020 · Mix the dry depo thoroughly using a spade. Confirm that the cement, sand, and metal are uniformly mixed. Pour the required quantity of water in the above mixture, to maintain the water-cement ratio and to get workable concrete. Pour the concrete in place, using ghamelas (Mortar pans). Use panja for spreading and leveling of concrete.

Learn More

Quantity and Rate Analysis for Reinforced Concrete

The second step is to determine the component of structure for which the RCC rate analysis is required, as the quantity of reinforcement steel varies with slabs, beams, columns, foundation, RCC Roads etc., though the quantity of other materials like sand, coarse aggregate and cement remain the same with the same mix design (mix proportion) of concrete.

Learn More

PCC Concrete Calculation | PCC Concrete Ratio | Plain Cement

Fine Aggregate: Sand is applied as fine aggregate. The FM of sand should be 1.2 to 1.5. Course Aggregate: Generally brick chips are utilized for developing PCC. Stone chips are also applied for this purpose. The size of the course aggregate is 20mm downgrade. Water: Clean water that is safe to drink should be utilized in PCC.

Learn More

Civil At Work: How To Calculate U.C.R. Masonry & Plinth

Plinth protection for building with rubble soling pcc (1:3:6) Consider 4 inch thick pcc (1:3:6) with 1 inch slop. Quantity of sand required. 0.112 x 3 = 0.336 m 3.

Learn More

How to Calculate Quantities of Cement, Sand and Aggregate

2/7/2017 · Volume of Sand required = 2/7 X 1.54 = 0.44 Cum or 15.53 cft Volume of Aggregate required = 4/7 X 1.54 = 0.88 Cum or 31.05 cft Note: 1 cubic meter = 35.29 cubic feet

Learn More

What is Plain Cement Concrete (PCC) in Construction of

A strength of PCC is defined as compressive strength after 28 days, expressed as M15, M20, where M stands for Mix and 15 stands for 15 N/mm 2 compressive strength at 28 days. The proportions of materials (cement, sand, coarse aggregate) for nominal mix/design mix concrete that are normally used are 1:3:6 or 1:4:8.

Learn More

Calculate Cement Sand & Aggregate - M20, M15, M10, M5

Suppliers sell sand and coarse aggregate in the measurement of Cubic Feet (CFT), UNITS and in lorry or tipper LOADS. One UNIT measurement is equal to 100 cubic feet. One cubic meter is 35.32 Cubic feet. Hence 15.08 cft of sand and 30.16 cft of aggregate is requied to prepare one cubic meter of M20 grade concrete.

Learn More

Material Calculation for PCC Concrete | Civil engineering

This construction video provides detailed guidelines for material calculation for PCC concrete and how to calculate material in PCC.

Learn More

How to Calculate Quantities of Cement, Sand and Aggregate for

Sand required = 115(Kgs)/0.167(m3) = 688 (Kgs/m3) or 14.98 cft Aggregate required = 209(Kgs)/0.167(m3) = 1251 (kgs/m3) or 29.96 cft As the units of Sand & Aggregate seem to be in Kgs/m3, therefore multiplication with Bulk Density (Kgs/m3), the result will be unit less.

Learn More

How to Calculate Cement Sand And Coarse Aggregates And

In This Session I Will cover the topic how to find out quantity of Plain Cement Concrete And Cement,Sand And Coarse Aggregates in Excel And you will see how

Learn More

Concrete Calculator - Estimate Cement, Sand, Gravel Quantity

Concrete mix estimation. Our mix-on-site concrete calculation is based on batching by volume (Large construction sites employ batching by weight which is more exact). You can also estimate the quantity of sand and gravel required by weight; Simply multiply the volumetric quantity of sand and gravel with 1400 kg/m 3 (bulk density of sand) and 1600 kg/m 3 (bulk density of stone) respectively, when calculating in metric units.

Learn More

PCC Concrete Calculation | PCC Concrete Ratio | Plain

PCC is applied over brick flat soling or without brick flat soling. Plain cement concrete is also known as "cement concrete (CC)" or "binding concrete". Materials required for forming PCC: Cement: Usually the Portland cement is applied as bonding material in PCC. Fine Aggregate: Sand is applied as fine aggregate. The FM of sand should be 1.2 to

Learn More

Why we provide PCC in Every construction & Notes | Civil

The term PCC stands for plain cement concrete. The mixture of cement, sand and coarse aggregate are generally called plain cement concrete (PCC). .It is also defined as Cement Concrete or Blinding Concrete.. The main reason of providing PCC is to provide a rigid impervious bed to RCC in the foundation before starting any RCC or masonry work directly on the excavated soil, PCC is done to form a

Learn More

PCC Volume Calculator | Free Estimate of Cement, Sand, Jelly

Plain Cement Concrete (PCC) is composed mixture of cement, aggregates, sand, water and chemical admixtures. Calculate portland cement concrete or PCC concrete mix design ratio in Cft and determine exactly how much quantity of cement, sand and aggregate is required for PCC construction.

Learn More

Actual Concrete Mix Ratios For 3000, 3500, 4000, and 4500 psi

3. Sand = 5620 pounds. THIS GIVES YOU A BASIC 4000 PSI CONCRETE MIX RATIO OF: 1 PART CEMENT; 2.93 PARTS STONE; 2 PARTS SAND; Rounded off it's basically a 1 : 3 : 2 mix ratio. If I break the weights down per cubic yard of concrete, it comes to: 1. Cement = 624 pounds. 2. Stone = 1833 pounds. 3. Sand = 1249 pounds

Learn More

Rate analysis for PCC 1:4:8 (M7.5) - calculate quantity

step 3, Sand quantity :-generally sand measured in CFT and 1m3 = 35.3147. Quantity of sand = 4/13 ×1.54 × 35.3147 = 16.73 cft, so 16.73 cft sand quantity required for 1m3 PCC grade m7.5. If market rate of sand is consider INR 40 per cft, then cost of 16.73 cft sand = 16.73 × 40 = INR 669, so cost of sand for 1m3 of PCC m7.5 grade = INR 669.

Learn More

Sand Filling Footing | Sand Filling Procedure

Furthermore, M-sand is quite robust as well as low-cost with reference to river sand. Advantages of PCC bed: In case PCC bed is utilized, it offers excellent constancy to the foundation bed as well as opposes termite access to the structure.

Learn More

How To Calculate Cement, Sand Quantity For Plastering

2. For ceiling plastering, Cement : Sand = 1 : 4. 3. Thickness of plaster should be in between 12-15 mm. If an additional coat is required then do not do it at one go. 4. Use good quality of cement & Sand. 5. Use measuring box (not head pan) for site mix. We will calculate cement and sand for 100 m 2 plastering area in 1:6 ratio and thickness

Learn More

How many bags of cement are required in 1m3 of M15? - Quora

Hi .. So the design mix is M15 i.e, 1:2:4 Ratio sum = 1+2+4 = 7 Volume of concrete = 1 cubic metre ( wet volume ) Now dry volume of concrete = 45–55% increase in volume × wet volume Dry volume= 1×1.52 (assuming 52% increase in volume) Dry volume =

Learn More

Calculate Quantities of Materials for Concrete -Cement

Thus, the quantity of cement required for 1 cubic meter of concrete = 0.98/0.1345 = 7.29 bags of cement. The quantities of materials for 1 m3 of concrete production can be calculated as follows: The weight of cement required = 7.29 x 50 = 364.5 kg. Weight of fine aggregate (sand) = 1.5 x 364.5 = 546.75 kg.

Learn More

How to Find Plastering quantity? | Cement, Sand, Water Qty

Step 4: Finding the quantity of water required for plastering: Amount of water to be added in mix depends upon the moisture content present in cement, sand & atmosphere. Quantity of water = 20% of total dry material (Cement+Sand) = 20% of (574+2560) = 0.2 x 3134 = 627 litres.

Learn More

Concrete Tube Calculator | Concrete Pipe Calculator

Amount of Sand Required Sand Volume = Dry Volume × Sand Sum of Ratio = 0.27 × 1.5 5.5 = 0.07 Sand in Ton = Sand Volume × 1550 1000 = 0.07 × 1550 1000 = 0.11 Tons

Learn More

Cement Concrete Calculator | PCC Calculator | RCC

Quantity; 1: Cement: 2216.73 Bags: 2: Sand: 180.39 Ton: 3: Aggregate: 314.22 Ton

Learn More

Calculate Footing PCC Quantities | PCC Concrete Calculation

PCC is formed by amalgamating the following materials: Cement: Normally, Portland cement is applied as bonding material in PCC. Fine Aggregate: Sand is employed as fine aggregate. The FM of sand should remain at 1.2 to 1.5. Course Aggregate: Usually, brick chips are utilized for developing PCC. Besides, stone chips are also applied herewith.

Learn More