excavation ordinary hard soil

6 thoughts on "On the Use of Soil Drained and Undrained Parameters

Porous materials like soils have different design properties under drained and undrained conditions. As you all know in drained condition, the pore water can easily drain out from the soil matrix while in undrained condition the pore water is unable to drain out or the rate of loading is much quicker than

Learn More

Excavations - Oregon

sloping, benching, shoring, and shielding.The method you should use depends on factors such as soil type and water content, excavation depth and width, the nature of the work, and nearby activities that could increase the risk of

Learn More

Excavation Ordinary Hard Soil

trenching and shoring requirements. all workers on an excavation site must wear hard hats. unusual or out of the ordinary findings discovered. excavation cost . average costs and comments from costhelper's team of professional journalists and community of users. although most excavation companies (soft soil, hard pan . trench excavation toolbox

Learn More

Earthwork in excavation in foundation-Detailed specification

Excavation-Foundation trenches shall be dug out to the exact width of foundation concrete and the side shall be vertical. If the soil is not good and does not permit vertical sides, the sides should be sloped back or protected with timber shoring. Excavated earth shall not be placed within 1m (3’) of the edge of the trench.

Learn More

Hard Excavation Dispute - Engineering Companies

owner over the hard excavation quantity. The project involved installing the third phase of a major sewer line mainly in an open cut in soil and rock. Phase III was about 2 miles long (see Figure 1). Figure 2 shows the excavator attempting to rip rock in the bottom of the trench excavation. The hard excavation quantity measured and reported by the

Learn More

3 Ways to Fix Compacted Soil - wikiHow

How to Fix Compacted Soil. Compacted soil and plants don't go well together. Without enough air space in soil, there's no room for water and nutrients to circulate, and the roots on your poor plants have nowhere to grow. The good news is

Learn More

Types of excavation - Designing Buildings Wiki

In construction terms, excavation is the process of removing earth to form a cavity in the ground. On small sites or in confined spaces, excavation may be carried out by manual means using tools such as picks, shovels and wheelbarrows. Larger scale excavation works will require heavy plant such as bulldozers and backactors.

Learn More

Estimation, Costing & Quantity Surveying ⇒ Civil

The expected Out turn for earth work in excavation in ordinary soil per mazdoor per day is: A. 1.00 cu. m. B. 2.00 cu. m. C. 3.00 cu. m. D. 4.00 cu. m. View Answer 24 -9 Q17. For 100 square metres of plastered surface, the quantity of lime required for one coat of white washing will be

Learn More

RATE ANALYSIS OF CONSTRUCTION ITEMS

Excavation Excavation in Ordinary Soil 500.000 cu.mt 130.13 65064.00 2. PCC M10 P.C.C. 1:3:6 in foundation / leveling course 40.000 cu.mt 3204.09 128160.00 3. RCC M20 Rcc M20 (1:1.5:3) concrete in Ordinary Works 200.000 cu.mt 4436.00 887200.00 4. Masonry MBK/ VOL-1 100.000 cu.mt 1695.00 169500.00

Learn More

Specifications of excavation and foundation

8/25/2016 · • For hard soils when the depth of excavation is less than 1.5 m, the sides of the trench do not need any external support. If the soil is loose or the excavation is deeper, some sort of shoring is required to support the sides from falling. 14. EXCAVATION

Learn More

Hard Soil Excavation

About Press Copyright Contact us Creators Advertise Developers Terms Privacy Policy & Safety How works Test new features Press Copyright Contact us Creators

Learn More

Soil Classification in Excavation for Measurement and Payment

a) Ordinary soils These includes all kinds of soils containing kankar, sand, silt, hard and soft murrum and/or shingle, gravel, clay, loam, peat, ash, shale, etc., which can generally be excavated by spade, pick axes and shovel, and which is not classified under “soft and decomposed” and “hard rock” defined below.

Learn More

A Guide to OSHA Excavations Standard

An exception is hard rock, which remains firm after exposure to the elements. Soil failureis defined as the collapse of part or all of an excavation wall. The most common soil failure is typically described as an unexpected settlement, or cave-in, of an excavation. Soil sliding is the most common factor leading to soil failure.

Learn More

Trenching and Excavation Safety - Occupational Safety and

Certain conditions preclude soil from being classified as Type A. For example, no soil is Type A if it is fissured or has been previously disturbed. See Appendix A to Subpart P of Part 1926, paragraph (b) – Definitions (Type A), for a detailed definition of Type A soil. Type B – Includes cohesive soil with an unconfined compressive

Learn More

excavation ordinary hard soil

2.11.4 Where soil, ordinary rock and hardrock are mixed, the measurements for theentire excavation shall be made asspecified in 2.11.1 and 2.11.2 Excavatedmaterials comprising hard rock andordinary rock shall be stacked separately,measured, and each reduced by 50% toallow for voids to arrive at the quantitypayable under hard rock and ordinaryrock.

Learn More

Trench and Excavation Safety - Soil Types - OSHAcademy free online

The OSHA excavations standard recognizes and allows a variety of soil classification systems under certain conditions. A special simple soil classification system used by OSHA for excavation planning and protection is included in the standard.

Learn More

Classification of Soils for Excavations

killed in excavation cave-ins each year.3 Responding to this high incidence rate, OSHA promulgated the current excavation standard and it has the following requirements:4 1) Classification of soil and rock deposits: Each soil and rock deposit shall be classified by a competent person as Stable Rock, Type A, Type B, or Type C in accordance

Learn More

Pond Excavation Basics | Can You Dig It? - POND Trade Magazine

Clay Soil: Spring and fall are the best times for excavation because the clay is softer. Midsummer requires a pick-ax to chisel through the hardened clay. Clay soil in certain areas is notoriously bad, so the selling price of the job should reflect the extra time needed to complete the excavation if the soil causes difficulties.

Learn More

excavation ordinary hard soil – Grinding Mill China

excavation ordinary hard soil [ 4.8 - 8681 Ratings ] The Gulin product line, consisting of more than 30 machines, sets the standard for our industry. We plan to help you meet your needs with our equipment, with our distribution and product support system, and the continual introduction and updating of products.

Learn More

Analysis & Rates, Analysis and rates for construction work

Earthwork in excavation in ordinary soil. 3.00cum (100cuft)per belder mazdoor. 44. Earthwork in excavation in hard soil. 2.00cum (75cuft)per belder mazdoor. 45. Excavation in soil. 1.00cum (35cuft)per belder mazdoor. 46. Number of bricks laid by a mason in brick work upto a height of 3m(10”) 600 bricks per mason. 47.

Learn More

Rate Analysis of Excavation in Earthwork | Hard/Dense Soil

Soft/Loose Soil. Hard/Dense Soil. Mud. Soft/Disintegrated Rock. Hard Rock (Requiring Blasting ). Hard Rock ( Blasting Prohibited). Bills of Quantities. Most Important Factor of Rate Analysis of Excavation in Earthwork.

Learn More

EXCAVATION WORK PLAN - Records Collections

Table 2 - Summary of Pre-Excavation Soil Sampling TCLP Results from the Abandoned Canal Table 3 - Summary of Pre-Excavation Soil Sampling Dioxin Residts from the Plant Area Table 4 - Summary of Pre-Excavation Soil Sampling VOC and SVOC Results from the Plant Area Table 5 - Evaluation of Onsite Pre-Excavation Sampling Analytical Results - Dioxins

Learn More

IS 1200-1 (1992): Methods of measurement of building and

excavation; Forming (or leaving) ‘dead men’ and Generally any soil which yields to the ordinary application of pick and shovel, or to PHA WRA. rake or other b) 4 Where soft/loose soil, hard/dense soil, soft/ disintegrated rock and hard rock are mixed,

Learn More

Earthwork - Super Civil CD

3.2 - Excavation in Ordinary Rock by Manual Means 3.3 - Excavation in Soil with Dozer with lead upto 100 M 3.4 - Excavation in Ordinary Rock with Dozer with lead upto 100 M 3.5 - Blasting Hard Rock for Excavation with disposal upto 1000 M 3.6 - Excavation in Soil using Hydraulic Excavator and Tippers 3.7 - Excavation in Ordinary Rock using

Learn More

8 Types Of Excavation Used In Construction - Sierra Hydrovac

Excavation is an important part of any construction project. The process uses different tools and techniques to move soil, rock, and other material to form a cavity and prepare the area for construction. Building companies use several different types of excavation in construction.

Learn More

PPT of CPWD earthwork chapter

80. 2.16 EXCAVATION OVER AREA (ORDINARY/ HARD ROCK)2.16.1 This shall comprise:(a) Excavation exceeding 1.5 m in width and 10 Where the trenches are excavated in hard/soft soil, the filling shall be done with earth on the side and top ofpipes in layers not exceeding 20 cm in depth.

Learn More